Move your servers to the Nesnet cloud with a migration that is planned, rehearsed and ready to roll back
Migration runs as a project: the inventory and dependencies are mapped first, systems are grouped by how much downtime they tolerate, and every group is rehearsed on a copy. What happens on cutover night — and how to roll back if the plan fails — is written down in advance.
Hardware goes out of warranty within months, and every week spent deciding between refreshing and moving narrows the options.
Servers added over the years, forgotten scheduled jobs and hard-coded IP addresses can turn cutover night into a chain of surprises.
Finance can’t stop at month end and e-commerce can’t stop during a campaign; the move has to fit into a few hours.
An unplanned move with no way back turned into an all-night outage, and the team is wary of trying again.
| Today | With Nesnet |
|---|---|
| No one knows what will break on cutover night. | Every system is migrated and verified on a copy first; on the night, only rehearsed steps run. |
| Dependencies surface after the move, when something breaks. | What depends on what is mapped before anything moves. |
| Downtime is an estimate. | Downtime is measured during the rehearsal and shared with the business in advance. |
| If the plan fails, the fallback is improvised that night. | The rollback step is written from the start, and the old system stays on until verification is complete. |
| Once the move is done, the team is alone with the new environment. | Migrated systems are handed over with monitoring and backup already defined. |
Servers, applications, databases and the connections between them are mapped and documented.
Systems are grouped by downtime tolerance; order, time windows and owners are agreed with the business.
A non-critical system and copies of the critical ones move first, are verified with the application team, and downtime is measured.
Groups move in the agreed windows and every system is checked against a list; if the plan fails, the written rollback step runs.
Migrated systems are handed over with monitoring, backup and firewall rules; the old environment is shut down only on your approval.
Resource needs, connections and downtime tolerance for every system, collected in one written report.
Current usage is measured to work out the CPU, memory and storage you need in the cloud, so the monthly cost drivers are visible up front.
Order, windows, owners and communication steps in a single plan.
Critical systems are migrated and verified on a copy first, so the real cutover follows proven steps.
For every group, how to return to the old system if the plan fails is written in advance.
Each migrated system is checked against a list, with backup and monitoring defined from day one.
Your migration is planned by the team that carries out the Nesnet cloud’s own large platform transformations — step by step, verified, with a written way back.
Situation
A manufacturer’s server-room hardware goes out of warranty within six months; ERP, the file server and e-mail all live there.
Outcome
Systems are split into three groups: the file server goes first as the pilot, and ERP moves in a planned weekend window after month-end close.
Situation
The site can’t stop during campaigns, the database is large and even night traffic never drops to zero.
Outcome
Data is copied ahead of time and kept in sync, and the cutover happens at the quietest hour with a short final sync.
Situation
Every branch has its own ageing servers, each looked after by a different team.
Outcome
Branch systems are consolidated into one cloud environment, and branches reach the same applications over VPN.
| Nesnet | You |
|---|---|
| Inventory, dependency map and sizing | Sign-off from application owners and the business |
| Migration plan and rollback steps | Choosing the downtime windows |
| Rehearsal migration and downtime measurement | Application-level testing (business workflows) |
| Planned cutover and technical verification | Licence and third-party software details |
| Monitoring and backup setup | Approval to retire the old environment |
Compute
Your own quota, your own gateway and your own identity provider.
Compute
Linux and Windows servers, live in minutes and self-healing after failures.
Data Protection
Back up your servers and restore them yourself, no ticket needed.
Data Protection
An up-to-date copy of your on-prem servers, ready in our cloud.
We go through the systems to move, the downtime windows and your priorities, then send a written plan and quote.